Asphalt paving
The screed lays a uniform hot-mix mat. Steam rises from the black asphalt while the paver holds grade on the prepared road.
- Paver screed on the roadway
- Hot-mix asphalt mat in place
- Prepared grade under the lift
Century Construction Inc. places hot-mix asphalt, builds highway lanes, paves parking lots, installs aggregate base course, stripes finished pavement, and surfaces roadways from St Paul, Minnesota. The paver lays the mat; the steel-drum roller locks the density before the next lift or the next line of paint.
A paving ticket starts on the road: the paver places a uniform asphalt mat on the travel lane, the roller follows on the fresh lift, and the next lane is held until density is in the book. Highway construction uses the same train — paver, haul truck, and roller — on divided alignments.
Century Construction Inc. then takes that train to parking lots, base course installation, striping, and roadway surfacing so one contractor holds the granular layer, the asphalt, and the painted lines together.
Hot-mix is placed by the screed and compacted by the steel drum before traffic is released.
Highway, parking lot, base course, striping, and surfacing stay on one schedule.
Work is run from 96 Orange Ave W for buyers who need a local paving contractor.
Base course, asphalt mat, and striping are listed as hold points before the next cover.
The company focuses on asphalt paving, highway construction, parking lot paving, base course installation, striping, and roadway surfacing. The packages below are the work Century Construction Inc. prices and schedules.
Hot-mix asphalt placed by the paver screed on a prepared road, then compacted by the steel-drum roller. Roadway surfacing uses the same train for an overlay: a thin surface course on the existing alignment, steam on the mat, roller on the lift.
The screed lays a uniform hot-mix mat. Steam rises from the black asphalt while the paver holds grade on the prepared road.
A surface-course overlay is placed on the existing road. The roller follows the paver to lock the new lift.
Highway work is the paving train on a multi-lane alignment: paver, haul truck, and roller on travel lanes and shoulders. Parking lot paving uses the same asphalt placement across a stall field, with the paver and roller working the lot before striping.
The paver takes mix from the haul truck and places the travel-lane mat on the highway alignment.
Hot-mix is placed across the commercial lot. The paver, roller, and haul truck stay on the stall field until the mat is closed.
Aggregate base course is graded and compacted before asphalt. After the mat is finished, a striping machine applies yellow and white lane lines and stall marks on the black pavement.
The grader spreads crushed aggregate on the subgrade. The dump truck delivers the granular lift for the base course.
The striping machine lays yellow and white thermoplastic lines on the finished asphalt for lanes and stalls.
Work moves in one order: aggregate base course, asphalt paving or roadway surfacing, steel-drum compaction of the lift, then striping on the finished mat. Highway lanes and parking lots use the same hold points before the next cover.
The work we turn over is the same work shown here: a surfaced highway with lane lines, a striped parking lot, and an asphalt mat that has already taken the roller.
Travel lanes are surfaced. White dashed lines and the yellow edge line are on the finished asphalt.
The lot is paved. White stall lines are striped on the black asphalt.
The steel-drum roller has closed the lift. The mat is ready for striping or traffic release.
Asphalt paving and roadway surfacing on local alignments
Travel-lane construction with paver, haul truck, and roller
Parking lot paving and stall striping on one ticket
Lot resurfacing before yellow and white lines go down
Base course and asphalt on drive lanes and yards
Lot paving and striping held to the listed sequence
One paving sub for highway, lot, base, and paint
Work run from Orange Avenue for paving in the area